Complete Plants for CHLORINE/CAUSTIC – 500 mt/d
- EDC – 700 mt/d
- VCM – 600 mt/d
- GE Frame 6 Gas Turbine - 32MW
Facility available as integrated complex or as individual plants. Chlor-alkali plant includes 3000m2, triple effect caustic evaporator by Swenson of all nickel construction. Cells are under preservation and all anodes were recoated in 2001. Cold caustic decanter centrifuges (350HP) new in 2002, Rectifiers from 1999, Elliott chlorine compressors, York chillers. EDC consist of Direct Chlorination and Oxychlorination (Fluidized reactor) sections. EDC cracking takes place in (2) furnaces by Selas with HK40 tubes partially upgraded to Incoloy 800. Plant produces its own electricity with Frame 6 gas turbine.
1. Direct Chlorination - Area 100
2. Oxyhydrochlorination - Area 200
3. Cracking - Area 300
4. Purification - Area 400
5. Incinerator - Area 900